Sewer
September 18, 2007, by Splash Damage.The Strogg have infested the mammoth underground sewer network leading from the urban districts to the rural coast. A GDF task force must break through and override the sewer controls to flush the Strogg out before sections of the city are overrun.
Objectives
- A GDF Engineer must construct the EMP Disruptor to lower the Strogg shields and allow access to the sewers.
- GDF Soldiers must move into the sewers and destroy the north or south grates with HE Charges.
- Once a grate is blown, GDF Covert Ops should move in to hack the sewer controls.



